PEETRI CONCRETE SKATE PARK CONSTRUCTION /SS2020
This skate park is located in the small town of Peetri in Rae municipality. The size of the monolithic concrete skate park is 720m2, the design of the park is a mixture of a bowl-type skate park and a skate plaza with street elements. Suitable for both beginners and advanced riders. The skate park has a drainage system to drain rainwater.
KINDLUSE SCHOOL CONCRETE SKATE PARK CONSTRUCTION /SS2020
This skate park is located in the small town of Järveküla on the territory of the Kindluse School in Rae municipality. The size of the monolithic concrete skate park is 707m2, the design of the park is a mix of a bowl-type skateboard park and a skate plaza with street elements. Suitable for both beginners and advanced riders. The skate park has a drainage system to drain rainwater.
VALGA-VALKA CONCRETE SKATE PARK DESIGN AND CONSTRUCTION / SS2020
This skate park is located on the central square of the Valga-Valka joint town. The size of the monolithic concrete skateboard park is 600 m2, the design of the park is a skate plaza combined with street elements. The skate park is suitable for both beginners and advanced riders. Drainage of rainwater from the skate park is ensured by slopes, a drainage system is not necessary.
KLOOGA MONOLITHIC SKATE PARK RECONSTRUCTION / AW2020
Klooga skate park was established in 2010. Within ten years, its surfaces were worn out, incl. the structures of the elements and surfaces have been partially destroyed and sunk. During the construction work, we adjusted the sunken structures, giving the monolithic skateboard park the necessary slope to drain rainwater. We also supplemented the skateboard park with new objects and restored the constructions of usable elements. In the skate park, we changed all the driving surfaces. The size of the skate park is 396 m2.
PÄÄSKÜLA INDOOR SKATE PARK DESIGN AND CONSTRUCTION / SS2020
This indoor skate park is located in the premises of Pääsküla Youth Center in Tallinn. The size of the skate park is 300m2.
KÕPU MINI RAMP M+ DESIGN AND CONSTRUCTION/ SS2020
The ramp is mounted on stone blocks, its length is 9m, width 6m, height 1.25m + 30cm extension. The ramp is made of weatherproof materials.
MÕISAKÜLA MINI RAMP S+ wide/ SS2020
The ramp is mounted on stone blocks, its length is 7.6 m, width 4.2 m, height 1 m. The ramp is made of weatherproof materials.
KURESSAARE CONCRETE SKATE PARK DESIGN, PROJECT PLANNING AND CONSTRUCTION / AW2019
Kuressaare concrete skate park is 25 m long and 5 m wide. It is a minimalist and modern design that is suitable for public urban space. The skate park is located in the Kuressaare beach area “Titeranna” (“Baby beach”)
MÄRJAMAA SKATE PARK REPAIR WORK/ AW2019
Before the repair, the Märjamaa skate park was in poor condition, its plywood had holes in it and it seemed that it was no longer practical to repair the skate park. We agreed and during the repair, we replaced the first and second layers of waterproof covering plywood, as well as supported the frame and handrails. As a result of the repairs, this skate park will continue for several more seasons in case of constant maintenance.
PAIDE INDOOR SKATE PARK DESIGN, PROJECT PLANNING AND INSTALLATION/ SS2019
The indoor skatepark is built in the old Paide swimming pool directly in the pool. The size of the skate park is 500m2 and thanks to the different levels of the pool, the skate park became very playful and technical. This is the second skate park in Estonia, which has been built directly using the pool, taking advantage of its different heights, slopes and reliefs. The skate park has a wooden frame covered with birch plywood boards, metal L-profiles, copings and rails. The skate park is managed by Paide Open Youth Center.
KOPLI SKATE PARK DESIGN, PROJECT PLANNING AND INSTALLATION /SS2019
In cooperation with Tallinn enthusiasts, a technical and versatile design of the skate park was completed, where both beginners and advanced street athletes can ride at the same time. Kopli skate park has a weatherproof frame, which is covered with waterproof film-faced plywood. A ventilation system runs through the construction of the skateboard park, which ensures the long-term preservation of the park. The size of the Kopli skate park is 1549m2.
PIRITA SKATE PARK DESIGN, PROJECT PLANNING AND INSTALLATION / SS2019
Pirita skate park is 7m wide and 23m long and the design includes a mini ramp, hubba, quarter and bank. The skateboard park is built of weatherproof material, ie impregnated with a wooden frame, which is covered with waterproof plywood, galvanized L-profiles, etc. The skateboard park has a ventilation system through the structure, which ensures a better lifetime of the skateboard park.
PAIDE SKATE PARK PRODUCTION AND INSTALLATION/ SS2019
The size of Paide Primary School skate park is 405m2 and it consists of 7 different elements: quarter; house; ditch-quarter-ditch; vertwall; flybox; pyramid angle and vertall-ditch. The elements of the skatepark are spatially stable and can withstand the loads caused by riders and transport.
KUDJAPE FUNCTIONAL SKATE PARK/ SS2019
Kusjape Skateboard has a mini ramp with a spine, designed in collaboration with local youth. The mini ramp is 6m wide, 15m long, 1.25 / 1.5m high and has a medium steep radius. There are also wheel-mounted obstacles on the square, which young people can combine with other elements as they prefer. This skateboard is very functional for the riders, because they can change the technical solution of the skateboard independently.
MINI RAMP S+ DESIGN, PROJECT PLANNING AND INSTALLATION /SS2019
The mini ramp S+ is a small outdoor mini ramp. The ramp is 3m wide, 7.6m long and 1m high. It has a medium-sharp radius and is suitable for both beginners and advanced riders. The ramp has a structural ventilation system that ensures the long-term preservation of the carcass.
SAUE SKATE PARK REPAIR WORK/ SS2019
Saue skate park was established in 2012 and its condition had become dangerous after seven years of use. During the repair work, we replaced all worn-out and broken plywood. We also supported the frame and fastened all loose elements and handrails. Saue skate park is a good example of how an old but good skate park can be repaired and thus extend the life of the park by several years.
LOIGU MINI RAMP DESIGN, PROJECT PLANNING AND INSTALLATION / AW2019
The Loigu mini ramp was designed in cooperation with the leaders of the Loigu indoor skate park, with whom it was also built. It is a mini ramp that is 1.5m high, 6m wide and 10m long. The top layer of the ramp uses a diagonal plywood installation style, which ensures a smoother movement of the ramp with smaller wheels (eg skateboard wheels).
VILJANDI SKATE PARK REPAIR WORK/ AW2018
During the repair works of Viljandi outdoor skate park, about a hundred layers of first and second layer outdoor plywood were replaced, the frame was supported, new ventilation grilles were installed, metal profiles were reattached and new handles were built for the structures. Viljandi Skate Park is once again in good condition and opened to riders.
PAIDE SKATE PARK REPAIR WORK/ AW2018
During the repair work, the worn outdoor plywood of the first and second layers was replaced. The carcass was also supported to prevent the recurrence of holes in the veneer. Local young people complained a lot about the climbs of the elements, which were uneven and about pipes (copings) that were poking out or about profiles – all the worries were eliminated. The size of the Paide skate park is 1000 m2.
HAABERSTI SKATE PARK REPAIR WORK/ AW2018
During the repair works, the worn-out first and second layers of outdoor plywoods were replaced. The carcass was also supported according to the joints of the plywood, so that new holes would not be formed so easily. A total of about 200 plywoods were replaced in the skatepark, the missing tips for grinding were added, the handrail was refitted and the carcass was supported where necessary. The size of the park is 1131 m2.
KIILI SKATE PARK DESIGN, PROJECT PLANNING AND INSTALLATION/ SS2017
The size of Kiili skate park is 480 m2. The skate park is built of weatherproof material, ie impregnated wooden frame, which is covered with waterproof plywood, galvanized L-profiles, etc. The skateboard park has a ventilation system through the structure, which ensures a better lifetime of the skateboard park.
TALLINN ILMARISE SKATE PARK REPAIR WORK / SS2017
The condition of the Ilmarise outdoor skate park was extremely bad before the repairs, but after replacing 81 plywood, supporting the carcass and partially rebuilding it, the local young people got a usable and safe skate park again. Ilmarise skatepark is a good example that even in very poor condition the park can be made usable.
MUHU MINI SKATE PARK INSTALLATION/ SS2016
The young people of Muhu did not have a skate park and to solve the concern we helped the local young people get a mini-skate park. In cooperation with young people, we designed 5 portable obstacles made of materials suitable for outdoor conditions. The elements have wheels under one side so that young people can combine the obstacles according to their preferences and easily take them to the garage in bad weather.